Electrical engineering
The expert staff of the engineering and electrical fitting department is in charge of the following activities:
- design and implementation of high voltage power installations,
- design and implementation of computer networks,
- design and implementation of telephone systems,
- design and implementation of security systems in buildings,
- design and implementation of fire protection systems,
- design and implementation of video surveillance systems,
- design and implementation of audio system in buildings,
- computer network measuring and certification,
- creation and installation of IP telephone switchboards,
- large scale controlled entrance system design and equipment installation,
- design and implementation of working hours tracking systems.
In the course of 2010, the workpower of the Electrical Engineering Department was expanded, broadening the specter of our services. New manpower is specialized in the following electrical fitting activities:
- thermal power station repair,
- dismantling and mounting of equipment and installations,
- cables: setting, connecting, checking,
- setting, creation of routes and protection of signal and voltage cables,
- creation and installation of automatics systems and electro-energetic equipment,
- mounting of measuring, regulating, and operating equipment,
- creation, mounting, and servicing of low and middle voltage cabinets,
- high voltage transformer station maintenance.
The Electro-Engineering Department’s Reference List
- Termoelektroenel
- Public enterprise „Poslovni prostor opštine Palilula“, telephone system with a central office, the installation setup, training, in 2011.
- Vatroival - Kosjerić Cement - titanium, performing the installation for the early detection, prompt detection and automatic fire extinguishing, in 2011.
- Vatroival - MFC, implementation of fire protection installations and equipment setup, in 2010.
- Voith Turbo, the installation of video surveillance, in 2010.
- Day nursery Dr. Simo Milošević, Kindergarten Flora, reconstruction and replacement of complete installation of high and low voltage, in 2010.
- Ministry of Justice of the Republic of Serbia, The first main court, design and construction of installing emergency alert system in courtroom, in 2010.
- Thermal Power Plant “Pljevlja” 2009 - 2010
- Football Stadium FC Crvena Zvezda, on-line ticketing system, electronic entrance control at the Stadium, SKYDATA
- Jugoinspekt Beograd
- IEFK Banka a.d. Banjaluka, implementation of installations
- Child and Youth Health Protection Institute, installation repair
- Belgrade Hospital Medical Center, the first private clinic in Belgrade, area 6000 sqm, www.bgdkbc.com high and low voltage power installations and implementation of specific hospital systems
- Ministry of Justice of the Republic of Serbia, 5th Municipal Court in Belgrade, front-desk lobby installations, complete replacement of existing installations
- Ministry of Justice of the Republic of Serbia, 4th Municipal Court in Belgrade, front-desk lobby installations
- Ministry of Justice of the Republic of Serbia, Hall of Justice, repair of existing installations
- Ministry of Justice of the Republic of Serbia, Special Court in Belgrade, complete design and implementation of attic installations, repair of installations on other floors
- Ministry of Justice of the Republic of Serbia, special courthouse in Bačvanska Street, installations
- Sports Recreational Center Muškatirović, tennis courts for the ATP Serbia Open tournament, design and implementation
- Wellness Center Corpore – Belgrade, design and implementation
- Republic Pension and Health Insurance Fund – Novi Pazar Branch, complete restoration of installations
- Serbian Hospital Medical Center “Neonatology”, complete restoration of installations (January 2007)
- Ministry for Diaspora of the Republic of Serbia – complete restoration of high voltage power installations and lighting (January 2007)
- Republic Pension and Health Insurance Fund - Novi Sad Branch, floors
7 + 1, restoration, design, and implementation of low and high voltage power installations and equipment mounting (November 2007 to February 2010)
- OTP Bank (Niš, Kragujevac, Kruševac, Aleksinac, Prokuplje) - computer network, fire protection, anti burglary, and video surveillance equipment (December 2007)
- OTP Bank (Bujanovac, Doljevac, Gadžin Han, Žitkovac) – computer network, fire protection, anti burglary, and video surveillance equipment (August 2007)
- Serbia Waters Regional Center Niš – computer network (June 2007)
- Parking Service Niš – computer network, IP telephone switchboard, computer equipment (May 2007)
- Health Center – Barajevo – computer network (April 2007)
- Health Center – Barajevo – computer network (March 2007)
- Health Center – Smederevska Palanka – computer network (January 2007)
- Health Center – Dimitrovgrad – computer network (December 2006)
- Health Center – Sokobanja – computer network(November 2006)
- Hotel Balkan - low voltage power installations (January 2006)
Contact:
Director: Zdenka Pavlović, zdenka.pavlovic@grappologroup.com, 063/26-26-22
Tehnical preparation consultant: Vladan Tufanović, engineer, vladan.tufanovic@grappologroup.com, 062/800-77-33
Design: Saša Ignjatović, engineer, sasa.ignjatovic@grappologroup.com, 062/800-66-42
Installation by floor channels at the information desk of the Republic Health Protection Institute Novi Sad.
Stadium of FC Crvena Zvezda – placement of armature and holder of the ticket check system with security barrier. Technician of Skidata Austria with Grappolo technicians.
Stadium of FC Crvena Zvezda service training
Installation of lightning conductor at the Republic Health Protection Institute Novi Sad
Electrical cubical at the Republic Health Protection Institute Novi Pazar
Ceiling lighting at the Republic Health Protection Institute Novi Sad
Ambient stairway lighting at the sport recreational center Gala Muškatirović
Belgrade Hospital Medical Center, surgical block with intensive care unit, correction and finishing of signal command installation
Republic Health Protection Institute Novi Sad roll call system
Ambient ceiling lighting at the sport recreational center Gala Muškatirović